Project Updates

5 of 7 Bridges Erected

Dec 31, 2020

As of December 2020, five out of the seven bridges that are part of the project’s scope have been erected. The bridge (pictured to the left) runs along I-295 northbound and crosses over South Capitol Street SW. Construction for the final two bridges is underway.